1

With our unparalleled experience in construction industry, we understand the challenges involved in any building project. That is why we believe in educating our clients and save them from mistakes resulting in costly failures. We have set up tools, technologies and processes that help us deliver every project on time and within budget.

Our Strategy and Project Plan
Step 1 – Determine Eligibility
Below is some compliance that needs to be met and obtained for fast approval with no council DA requirement if possible.

Property search
Below is some compliance that needs to be meet and obtained for fast approval with no council DA requirement if possible.

Sewer
You will need to obtain a sewer diagram from council, $25.60 or from Reece.

Land Size
Your property needs to be larger then 450m2 and 12m wide and meet the required boundary set backs.

Trees
You will need to advise us if there are any trees in your backyard that are over 6m in height, they will need to be 3 meters away from granny flat construction.
Step 2 – Site Inspection
Our Surveyor will conduct a contour plan of your site and carry out all necessary requirements needed. This will then be forward to in-house draftsman and he will align it with your property.
Step 3 – Design
When the tender is accepted you can then select from our great range of already drawn up architectural plans, otherwise our draftsman can assist you in drawing up a more custom plan that suits your requirements and your property (at an extra cost).
Step 4 – Final Approval
When the architectural plans are selected or drawn up, our private certifier will acquire all necessary approvals from structural engineering to BASIX reports.
Step 5 – Construction
Construction begins; this can be done from start to completion in as little as 10 weeks. Our experienced builders will do everything they can to keep your property as well kept and maintained as possible while construction is in progress.
Step 6 – Delivery
After Finalisation of construction, your new granny flat is officially ready for aquiring by you!
You own it.
Satisfied as you'll be, you should redirect people looking for granny flats to US!
Completed Projects
1
Check out our completed projects
OUR ADRESS

29 Debbie Circuit,
Mount Druitt NSW 2770,
Australia

OUR PHONES

Phone: +61 2 96756138

Mobile: +61 412228545

Fax: +61 2 96756188

Our memberships